Get a Quote

Let's build your project together.

Request a quote for steel construction, welding and fabrication; our expert team will get back to you shortly.

Get a Quote →0352 322 11 19
Mehmet Yücel Yapı Çelik

Building a facility means hoping for tomorrow. We construct structures that meet the needs of industry leaders with modern, internationally standardized practices.

Company

  • About Us
  • Certificates
  • Our Machines
  • Factory Gallery
  • References

Services

  • Steel Construction
  • Welding & Fabrication
  • Steel Roofing
  • Plasma & Laser Cutting
  • Mezzanine Floors
  • Custom Projects
  • Steel Chimneys
  • Silos
  • Multi-Storey Steel Buildings

Explore

  • Projects
  • Blog
  • Contact

Write to us

Örenşehir Mah. Bayrak Cad. No:128, 38560 İncesu / Kayseri, Türkiye

0352 322 11 19

0532 794 05 40

info@mehmetyucelyapicelik.com.tr

Mon - Sat: 08:00 - 18:00

© 2026 Mehmet Yücel Yapı Çelik Sanayi ve Ticaret Limited Şirketi. All rights reserved.Personal Data Privacy Notice

Design & developmentCNZ Adworks
ISO 9001:2015ISO 14001:2015ISO 45001:2018EN 1090-2 EXC3ISO 3834-2:2021
Skip to content
Mehmet Yücel Yapı Çelik
Home
Company▾
Services▾
Projects
References
Blog
Contact
TR0352 322 11 19Get a Quote
  1. Home/
  2. Blog/
  3. How Are Steel Structures Built?

18 June 2021 · 1 min read

How Are Steel Structures Built?

How Are Steel Structures Built?

From design to fabrication

The building brief defines its intended use, clear spans, internal height and equipment layout. The design team coordinates these requirements before producing fabrication information. Confirming interfaces early reduces the need to change finished components on site.

Preparing components

Approved information is developed into part dimensions, connection details and assembly sequences. Workshop activities include material acceptance, cutting, drilling, welding and surface preparation. Part identification connects the fabricated elements to the drawings and delivery plan.

Site readiness

Coordinate foundations, anchor positions, lifting access and storage areas with the workshop schedule. Check site measurements before deliveries begin and record installation inspections. Agree on the required handover documents before the work starts.

Discuss your project with our team.

Latest posts

14 November 2026

What is EN 1090-2 EXC3? Reviewing steel fabrication certificates

13 November 2026

What Determines a Steel Construction Quotation?

12 November 2026

Planning a Steel Factory Around Production