Start with material flow, machine positions and maintenance access. Share lifting requirements and rooftop equipment with the design team early. Discuss future production lines before fixing the layout, so the building supports operations throughout its service life.
Prepare for the project discussion
Bring available drawings and operating information, identify undecided items and agree on responsibilities with your project team. Keep design assumptions, approvals and handover requirements in a shared project record.

