Roof decisions should address internal conditions, drainage, interfaces and maintenance. Coordinate cladding with the building structure and services. Any future rooftop equipment should be reviewed for loads and connection details before installation.
Prepare for the project discussion
Bring available drawings and operating information, identify undecided items and agree on responsibilities with your project team. Keep design assumptions, approvals and handover requirements in a shared project record.


