As Mehmet Yücel Steel Construction, we completed treatment pool and canopy platform projects at the Remay facility using 140 tons of steel. Work starting in November 2022 was completed in December 2022.
We built the steel construction infrastructure for industrial treatment pools. Steel elements used in treatment facilities were processed with specialized protective coatings resistant to chemical environments and moisture conditions. Poolside platforms and walkways were designed for operator access and maintenance convenience.
We built canopy and platform structures across the facility to expand production and storage areas. The steel canopy structures were integrated into the existing facility with minimal disruption thanks to their lightweight and durable design.
Completed in 2 months, the Remay project is a successful example of our steel construction solutions for environmental and waste management infrastructure.