As Mehmet Yücel Steel Construction, we completed a 300-ton steel construction project for Orhan Demirçelik, starting in January 2022 and finishing in February 2022. Completing the fabrication and erection of 300 tons of steelwork in just 2 months is a tangible demonstration of our production speed and organizational capability.
The project's quick completion was made possible by our Kayseri production facility's capacity and our team's coordination. We activated multiple production lines simultaneously to accelerate steel component fabrication. Cutting, welding, surface preparation, and painting operations were carried out as parallel processes.
Despite the fast delivery pressure, we maintained our quality standards. All steel components were fabricated in compliance with EN 1090-2 structural standard and ISO 3834-2 welding quality standard. During erection, every connection point was inspected to ensure structural safety.
The Orhan Demirçelik project stands among our references proving our capacity to respond quickly to urgent needs and deliver large-tonnage projects with quality within short timeframes.
Next
Custom Parking Structure →